The foundation work for this residential project has been completed with proper leveling, soil compaction, and reinforcement placement. Our team ensured correct footing depth, concrete strength mix ratio, and curing duration for long-term stability.
This stage forms the structural base of the entire building, so every measurement and alignment was double-checked under engineering supervision. With foundation work finished, the construction will now enter the next phase of column and plinth beam development.
We appreciate the patience and support of our clients as we progress toward building a safe and durable home.