The project has entered the plastering phase, where both interior and exterior walls are being smoothened for a clean finish. The plaster mix is being prepared with accurate cement-to-sand ratio to ensure strength, bonding, and crack resistance.
Our team is maintaining even thickness on all wall surfaces while aligning edges for a neat, uniform finish. After plastering, the site will proceed to flooring, tile work, and electrical fitting installation.
This step marks the beginning of visible interior refinement.
wall plaster update
interior finishing progress
home construction finishing stage