The site has now moved into the structural framing stage, where columns and beams are being cast. Steel reinforcement has been installed according to structural drawings and checked for spacing accuracy, bending quality, and proper anchoring.
Concrete is being poured with controlled mixing and careful vibration to avoid air gaps, ensuring strong bonding and durability. The frame forms the backbone of the entire building, supporting all future loads and architectural elements.
Work is progressing as per schedule and site safety standards.
pillar casting update
beam structure progress
residential building framework