Flooring work has begun with careful layout marking and leveling. High-quality tiles are being installed with proper spacing and adhesive bonding to ensure durability and perfect alignment.


Our team is ensuring tile cutting at corners, drain slope correction in bathrooms, and straight joint patterns for a premium finish. The flooring stage plays a major role in defining the visual elegance of the interior.


Once flooring is completed, remaining steps include door fitting, wall paint, and final polishing.