The construction of this project is moving forward steadily with each phase being completed with precision and proper site planning. At the current stage, the structural framework is shaping up, including column reinforcement, beam casting, and slab support formation.
Our engineering team is ensuring that the quality of materials and work execution matches industry standards and safety guidelines. Every element is being cross-checked to maintain structural strength and design accuracy.
We are maintaining regular on-site supervision, verifying alignment, curing process, and reinforcement bindings to ensure long-term durability of the building. As construction progresses, finishing details like brickwork, plastering, and utility fittings will soon follow according to schedule.
Stay connected for the next update, where we will showcase progress on the brickwork and wall layout stage.
house construction update
residential building progress
architectural project development